
The world runs on turbines.
Power demand has grown exponentially and the supply chain that builds them consolidated and withered decades ago. AI data centers, reshored factories and an electrifying economy need power this decade and generation is the bottleneck. Stone designs and manufactures large industrial turbines native to the AI factory from clean sheet, meeting demand today to scale the technology of tomorrow.
12–18 months
From deposit to turbine.
10 GW / year
Factory and forge at full rate in 2030.
2.5 ppm NOx
Dry, no SCR.
800 VDC
In development for the next generation of data centers.


Speed to power.
Twelve to eighteen months from deposit to turbine. A simpler machine with fewer parts, built from what dozens of suppliers can make, so your site turns on years sooner.

Most permittable turbine on the market.
2.5 ppm NOx without SCR keeps more projects under minor-source thresholds. That means faster permits, more power per permit and room to build in non-attainment zones.

Designed for where the grid is going.
A hybrid turbine, designed from day one to run with batteries on the same bus. The battery takes the load swings and the fast starts, the turbine runs steady and the electrical side delivers 60 Hz AC today, with 800 VDC in development. The same core and factory carry into nuclear steam and geothermal next.
Unleash an era of energy abundance by manufacturing power at the speed the moment demands.

AI and a reindustrializing economy are scaling faster than the power to run them. Stone builds the turbines that let generation catch up.
How much power do you need?
Standard block: 300 MW, five 60 MW units.
Reservation received — we'll be in touch shortly.